Client Context
A flexible generation developer delivering a fast-start gas peaking facility intended for Capacity Market participation and grid balancing services.
Challenge
While EPC and engine OEM packages met minimum compliance, the client sought assurance that thermal cycling, vibration, and fatigue risks associated with frequent starts would not undermine long-term availability.
Equitus Role
Equitus acted as Owner’s Engineer to:
Review EPC mechanical design assumptions
Independently assess fatigue loading under realistic duty cycles
Challenge conservative OEM exclusions that shifted risk to the owner
Outcome
Clarified true operational envelope versus contractual assumptions
Informed negotiations on warranty scope and maintenance provisions
Reduced uncertainty around long-term availability projections
Value to Asset Owner
Improved alignment between commercial forecasts and real mechanical behaviour.